Home > News > News from Enterprises

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-07-23 09:41:24

 Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.


In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.

 

6ce26866113e5e61e5841209cad8067.png



    
 
Recommended information
Focus on MWC25 | “Connecting for a Better Digital Future” - Fiberhome
Focus on MWC25 | “C
MWC25 Interview | Hengtong: Firm Pace of Internationalization, Leading Innovation in Communications Industry
MWC25 Interview | He
AllPoints Fibre calls for crackdown on ‘misleading’ broadband advertising
AllPoints Fibre call
Openreach’s full fibre rollout to boost economy by £73bn in next decade – report
Openreach’s full fi